Maxx Environmental completed an Orlando lift station rehabilitation project involving severe groundwater infiltration concealed behind an existing fiber-reinforced liner. The deteriorated lining required removal before structural repairs and SewperCoat® application could begin.
Crews removed the existing liner using chipping hammers, exposing the underlying structure for rehabilitation. The project included replacing HDPE piping and applying SewperCoat® at a minimum thickness of 1 inch to restore and protect the lift station’s interior surfaces.
The completed rehabilitation included new HDPE piping, pumps, and stainless steel base plates, providing a renewed protective lining and upgraded equipment within the existing lift station.
Learn more about our SewperCoat® lift station rehabilitation services throughout Florida.


