SewperCoat® Lift Station Rehabilitation: Orlando, Florida

Orlando Before
orlando-fl-lift-station-before-liner-infiltration.jpg
Existing Liner With Concealed Infiltration Before Repair

BEFORE: Existing fiber reinforced hard shell liner concealed severe groundwater infiltration occurring through the host structure and traveling behind the liner, making the infiltration difficult to detect from above.

previous arrow
next arrow

Maxx Environmental completed an Orlando lift station rehabilitation project involving severe groundwater infiltration concealed behind an existing fiber-reinforced liner. The deteriorated lining required removal before structural repairs and SewperCoat® application could begin.

Crews removed the existing liner using chipping hammers, exposing the underlying structure for rehabilitation. The project included replacing HDPE piping and applying SewperCoat® at a minimum thickness of 1 inch to restore and protect the lift station’s interior surfaces.

The completed rehabilitation included new HDPE piping, pumps, and stainless steel base plates, providing a renewed protective lining and upgraded equipment within the existing lift station.

Learn more about our SewperCoat® lift station rehabilitation services throughout Florida.